by designer | Feb 23, 2026
CASE STUDY Elikia North Sea Winches completed production of a x4 eight-point electrical mooring winches (GME-2000-D) capable of 50Te & VFD Controls for Bodewes Harlingen BV on the accommodation barge Elikia to be ultimately supplied to Perenco on a platform based...
by designer | Feb 23, 2026
CASE STUDY Sparrows North Sea Winches delivered a 40 tonne WLL winch to Sparrows Fluid Power in Aberdeen. The winch is part of a riser decommissioning project for Talisman Energy. The winch was designed to DNV 2.22 rules for offshore lifting equipment and has...